Damen Shipyards Group has delivered the first of a series of three ASD Tugs 2810 Hybrid to the Royal Netherlands Navy (RNLN).
The first standard hybrid tug, Noordzee, which is almost 29m-long, has been navigated by the RNLN into the Den Helder harbour.
The contract for the three ASD tugs emphasises the cooperative partnership that exists between Damen and the RNLN.
Currently, the RNLN has four conventional tugs in Den Helder, however, these older vessels do not have sufficient power to tug new ships such as the HNLMS Karel Doorman, HNLMS Rotterdam and the HNLMS Johan de Witt.
In addition, the old vessels still make use of normal propellers with rudders with restricted manoeuvrability, and no longer fit the vision of sustainability that the RNLN has for the future.
The ASD Tug 2810 Hybrid is one of Damen’s standard tugs, fitted with its hybrid propulsion system.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe vessel is equipped with two rudder propeller units for optimum manoeuvrability, and is able to sail on full electric power by means of a set of batteries, and also a diesel-electric on the generator set.
Both main diesel engines are used when full pull is required, giving a maximum bollard pull of 60t, ensuring that all heavy duty tug jobs can be carried out.
The RNLN, in cooperation with the Swedish Navy, has ordered five vessels, including the hybrid tugs, while the two additional Swedish tugs are also of a standard design, but are optimised for operations in icy waters.
As part of the order, the two other ships, the Waddenzee and the Zuiderzee, are scheduled to be delivered in mid-March and mid-June this year.
Image: ASD tug 2810 Hybrid Noordzee. Photo: courtesy of Damen Shipyards Group.